Close Menu
Bangla news
  • Home
  • Bangladesh
  • Business
  • International
  • Entertainment
  • Sports
  • বাংলা
Facebook X (Twitter) Instagram
Bangla news
  • Home
  • Bangladesh
  • Business
  • International
  • Entertainment
  • Sports
  • বাংলা
Bangla news
Home Bangladesh gets 450MW power from Adani
Bangladesh English

Bangladesh gets 450MW power from Adani

Arif ArifArmanApril 7, 2023Updated:April 7, 20232 Mins Read
Advertisement

ZOOMBANGLA DESK: Bangladesh Power Development Board (BPDB) last night received 450 megawatts of power on test basis from Indian Adani Group’s subsidiary Adani Power.

“Last 12 midnight, Bangladesh received 450 MW initially, which was increased to 750 MW”, said Md Shamim Hasan, director public Relations of Bangladesh Power development Board (BPDB).

He said the power supply, from Adani power plant at Godda in Jharkhand, will rise gradually in line with the demand, adding, “We are getting quality electricity from Adani power plant.”

According to the Power Grid Company of Bangladesh (PGCB), Adani and the BPDB completed the transmission line before the test run.

The PGCB has set up a substation in Bogura and 134 kilometres of transmission lines from the Chapainawabganj border to transmit power from the Godda plant.

Bangladesh has been importing power from India for supply without disruption since 2013. Now Bangladesh receives 1,000 MW of electricity from Bahrampur in West Bengal via Kushtia’s Bherama and 160 MW from Suryamoni in Tripura via Cumilla daily.

Adani Power and BPDB signed a memorandum of understanding in 2015 following a joint declaration issued during Indian Prime Minister Narendra Modi‘s visit to Dhaka that year. As per the MoU, the entire production from the project can be supplied to Bangladesh. (BSS)


iNews covers the latest and most impactful stories across entertainment, business, sports, politics, and technology, from AI breakthroughs to major global developments. Stay updated with the trends shaping our world. For news tips, editorial feedback, or professional inquiries, please email us at [email protected].

Get the latest news and Breaking News first by following us on Google News, Twitter, Facebook, Telegram , and subscribe to our YouTube channel.

450mw adani, bangladesh, english from gets national power
Related Posts
Nicki Minaj

Nicki Minaj Draws Attention After JD Vance Remark at AmericaFest Event

December 23, 2025
Steven Matz

Steven Matz Explains Decision to Join Tampa Bay Rays in Free Agency

December 23, 2025
Max Stranger Things 5

Max in Stranger Things 5: Fate Revealed as Consciousness Trapped in Vecna’s Mindscape

December 23, 2025
Latest News
Nicki Minaj

Nicki Minaj Draws Attention After JD Vance Remark at AmericaFest Event

Steven Matz

Steven Matz Explains Decision to Join Tampa Bay Rays in Free Agency

Max Stranger Things 5

Max in Stranger Things 5: Fate Revealed as Consciousness Trapped in Vecna’s Mindscape

alexander isak injury update

Alexander Isak Injury Update: Liverpool Striker Faces Lengthy Layoff After Ankle Surgery

Powerball Results

Powerball Results for $1.60 Billion: Did Anyone Win Last Night? Winning Powerball Numbers for December 22 Drawing

Venezuela oil

U.S. Seizures of Venezuela Oil Tankers Raise Tensions With China and Push Prices Higher

Brown University shooting

Brown University Shooting Suspect Remains at Large as MIT Murder Link Probed

AI shift

AI Shift in 2025 Reshapes Jobs, Design, and Business Models Worldwide

Washington Commanders quarterback

Washington Commanders Face Christmas Day Quarterback Crisis After Mariota Injury

Canucks vs Ducks

Canucks vs Ducks Tonight: Pacific Division Clash Brings Playoff Intensity to Honda Center

  • About Us
  • Contact Us
  • Career
  • Advertise
  • DMCA
  • Privacy Policy
  • Feed
  • Editorial Team Info
  • Funding Information
  • Ethics Policy
  • Fact-Checking Policy
  • Correction Policy
© 2025 ZoomBangla News - Powered by ZoomBangla

Type above and press Enter to search. Press Esc to cancel.