Close Menu
iNews Zoombangla
  • Bangladesh
  • World
  • Tech
  • Business
  • Sports
  • Entertainment
  • Bangla
Facebook X (Twitter) Instagram
iNews Zoombangla
  • Bangladesh
  • World
  • Tech
  • Business
  • Sports
  • Entertainment
  • Bangla
iNews Zoombangla
Home English Adani Power commences electricity supply from Jharkhand’s Godda plant to Bangladesh
Bangladesh English

Adani Power commences electricity supply from Jharkhand’s Godda plant to Bangladesh

By Arif ArmanApril 10, 2023Updated:April 10, 20232 Mins Read

Adani Power commences electricity supply from Jharkhand’s Godda plant to BangladeshZOOMBANGLA DESK: Adani Power on Sunday said that it has begun supplying electricity from its plant in Godda in Jharkhand to Bangladesh.

Adani Power Ltd (APL), a part of the diversified Adani Group, has commissioned the first 800 MW ultra-super-critical thermal power generation unit at Godda in Jharkhand. The plant has started with supplying 748 MW of power to Bangladesh, a company statement said.

The electricity supplied from Godda will significantly improve the situation in the neighbouring country as it will replace expensive power generated from liquid fuel, bringing down the average cost of power purchased, it stated.

“The Godda Power Plant is a strategic asset in the India-Bangladesh’s long-standing relationship,” said S B Khyalia, CEO of Adani Power, in the statement.

Advertisement

It is the first power plant in the country, which has started its operations from Day One with 100 per cent Flue Gas Desulphurization (FGD), SCR and Zero Water Discharge, it stated.

In November 2017, Bangladesh Power Development Board (BPDB) executed a long-term Power Purchase Agreement (PPA) with APL’s wholly-owned subsidiary Adani Power Jharkhand Ltd (APJL) to procure 1,496 MW net capacity power from 2X800 MW ultra-supercritical power project at Godda.

It is expected to commission its second 800 MW unit soon, it stated.

Bangladesh has one of the largest liquid fuel-based power generation plants in the Indian sub-continent region. The installed capacity of heavy fuel oil (HFO)-based plants is about 6,329 MW and high-speed diesel (HSD)-based plants is about 1,290 MW, totaling to over 7,600 MW.

Though at present, Bangladesh has long-term PPA ties with three other imported coal-based generators, the total tariff of Godda plant is competitive compared to peers, it stated.

Except for the headline, this story has not been edited by The Telegraph Online staff and has been published from a syndicated feed. (TTO)

fXinmwalink@tg
Arif Arman

    Arif Arman is a journalist associated with Zoom Bangla News, contributing to news editing and content development. With a strong understanding of digital journalism and editorial standards, he works to ensure accuracy, clarity, and reader engagement across published content.

    Related Posts
    RISC-V XuanTie C950 Qwen

    RISC-V XuanTie C950 reportedly runs Qwen without a GPU

    September 14, 2026
    T-Mobile iOS 27 iPhone Handoff

    T-Mobile plans a monthly fee for iOS 27 iPhone Handoff

    September 14, 2026
    JSW Combat plug-in hybrid SUV

    JSW Combat plans a Jetour-based plug-in hybrid SUV for India

    September 14, 2026

    Latest News

    RISC-V XuanTie C950 Qwen

    RISC-V XuanTie C950 reportedly runs Qwen without a GPU

    T-Mobile iOS 27 iPhone Handoff

    T-Mobile plans a monthly fee for iOS 27 iPhone Handoff

    JSW Combat plug-in hybrid SUV

    JSW Combat plans a Jetour-based plug-in hybrid SUV for India

    iPhone 18 Pro Max US model difference

    Apple says the US iPhone 18 Pro Max differs in one key way

    ARAI cylinder testing facility accreditation

    ARAI cylinder testing facility earns NABL accreditation

    FADA Delhi state chairperson

    FADA appoints Shailender Luthra as Delhi state chairperson

    LICO Epsilon recovered graphite

    LICO and Epsilon develop recovered graphite for battery anodes

    LG Studio and LG Signature

    LG Studio and LG Signature target different home-appliance buyers

    Sennheiser ownership and manufacturing

    Sennheiser’s ownership and manufacturing model explained

    TestFlight 4.3.1 fix

    Apple updates TestFlight to address a problem affecting beta testing

     

    Inews

    iNews Zoombangla is your trusted destination for fast, accurate, and relevant English news. We cover Bangladesh, world affairs, technology, business, sports, entertainment, lifestyle, science, and research for English-language readers. iNews Zoombangla is the English news edition of ZooBangla.

    • About Us
    • Contact Us
    • Career
    • Advertise
    • DMCA
    • Privacy Policy
    • Feed
    • Authors
    • Editorial Team Info
    • Ethics Policy
    • Correction Policy
    • Fact-Checking Policy
    • Funding Information
    © 2026 ZoomBangla Pvt Ltd. - Powered by ZoomBangla

    Type above and press Enter to search. Press Esc to cancel.

    tgXwa